电动吊篮,非标吊篮配件,吊篮租赁-无锡世鼎建筑机械有限公司

Wuxi Shiding Construction Machinery Co., Ltd.
Hanging basket and accessories

Tel:

13301521628

Special Weather basket construction contingency plans

As encounter some unusual weather conditions, the operator should correctly handle the basket, reasonably and effectively respond to unusual weather conditions arise, ensuring the operator basket, basket safety equipment and supplies, the emergency measures as follows:
First, the typhoon season winds or weather emergency measures:
1, during the typhoon season winds and construction, must arrange personnel responsible for listening to and watching the weather forecast and windy weather at any time to report unusual circumstances.
2, when the work of the gusts greater than 8.3 m / s (equivalent to five wind), must stop using.
3, when the work of the gusts greater than 8.3 m / sec. Or after a typhoon, should be prepared in advance, the basket must be parked to the ground, and with a rope fixed to the basket.
4, each time work, should be parked gondola to the ground, and cut off the power.
Second, thunderstorms and waterproof emergency measures:
1, thunderstorms should stop using electric basket, and the basket parked to the ground, and take measures fixed.
2, during the thunderstorm season construction, mine water should be prepared to work; in particular, electrical equipment and cables should be a comprehensive inspection, if damaged insulation or leakage phenomenon exists.
3, before each work, should hoist and electric control box waterproof treatment is necessary to prevent water from entering the night, set the guide does not work properly or the occurrence of leakage accidents.
4. If it is found Appliances inflow of rain or rain soaked, they should stop using the device immediately and notify service personnel to confirm qualified before use.
Third, other special weather conditions emergency measures:
1. When the temperature is above 40 ℃ weather, should cease operations, should be parked gondola to the ground, and cut off the power.
2, when the ambient relative humidity greater than 90% (25 ℃), should stop the job and cut off the power.
3. In case of snow or fog appears, stop work.
2016/06/25 13:24:52 477 Click

CONTACT

通用PCR试剂盒| 控制柜| L7000316不锈钢| 单晶硅压力变送器| 水下测厚仪| 车床加工| 电力液压制动器刹车片| 百级恒温实验室| HYDAC贺德克压力传感器| 高频率信号发生器| 不锈钢厚壁管| 专业的上海电动阀门生产厂家| SF6气体定性定量检测仪| 广东二代仿石环保透水砖| 可燃气体检测仪| 方形真空干燥箱| 广东金联宇厂家价格| 塑化剂小柱| 美国PARKER叶片泵| 腐蚀率仪| 船用护舷| 高频压力传感器| PW31E三相继保仪| 服装单件| 防爆除湿机生产制造厂家| 码头吊机| BQC(BQD)防爆电机控制器| 中频感应加热器| 煎鸡蛋饺皮机器| 玻璃瓶生产厂家| 20年专注生产塑料注塑机| 管道木垫块| 圣戈班软管| 电压降测试仪| 综合监测仪| 北京汉达森机械技术| 吸附脱硫分子筛| 高能效均质机| 高密度| 多功能吸入暴露染毒柜系统| 泰方电缆设备厂|