Remove the front hoist inspection

Hoist before demolition, site operators to check details surrounding environment, removal of obstacles, delineated the danger zone and set up fences or warning signs. To set up special care when removing.
Before removing to a unified command, the operator should obey the leadership, close cooperation, in strict accordance with tests, order, security measures. Particular attention to the stabilization of the frame body even when removing the wall rod.
Demolition operations, non-throwing objects from a height downwards. Remove the lever and so timely liquidation is placed at a predetermined position, and neatly stacked.
Demolition should be "removed after the first take, after take the first demolition" order. Demolition hoist, the power must be cut off before demolition work after inspection is correct. Before removing the wall connecting rod, you should set up a temporary wind cable rope or a support frame body to ensure free height of not more than two standard section.
Before removing the gantry Tian Liang, should take firm measures to two columns, respectively, to ensure the stability of the single column. Demolition work should be carried out during the day, night work should be well lit, interruptions in operation, the firm should take temporary measures.
All hoist operator must be certified correct to wear helmets and seat belts.
2016/06/25 09:38:41 355 Click

CONTACT

PTS11压力变送器| 宝德| 1910差压开关| 不锈钢防爆控制箱| 螺旋输送机厂家| 国产电子天平供应商(电子天平厂家直销)| 柴油发电机组厂家| 阻垢剂| 多功能食品检测仪器设备| 多环芳烃类标准物质| 防尘口罩| 成都泰盛吉自动化喷砂设备| 汽车尾箱锁测试盒| 双金属温度计| 维萨拉气体传感器| 冷媒检漏仪| 五莲红门牌石| 刨槽机| HYDAC贺德克液压滤芯| 养殖场污水处理车| 高压输液泵加料泵| 口服液洗烘灌轧机| 干冰机厂家| 振动频谱分析仪| 水下溶解二氧化碳传感器| 清洁度颗粒分析仪| AT1123辐射剂量率仪| 磁座钻| Cutler| 40电缆滑线导轨| 大气浓缩装置| vaisala维萨拉变送器| 下翻多插槽高配便携机| CINCON电源| 施乐百带蜗壳离心风机| 气环式高压鼓风机| 空调木托| 灭火器维修设备与灭火器灌装设备专业供应商| 硬齿面减速机[型号全]| 核物理实验设备| Burkert宝德PH计|